Road works are essential for maintaining the highway and to allow utility companies to lay, repair and maintain their equipment.  The majority of road works can be carried out with minimal disruption to traffic however at times it will be unavoidable to impact the way traffic flows on the highway. If any major works are in progress they are detailed at the foot of this page. 

Men At Work Sign

The interactive map shows road works that are currently in progress; the attached list shows planned works on all roads, or a shorter list shows planned works on only the major roads.  The lists of planned works should only be used as a rough guide as at times works may need to be rescheduled or cancelled at short notice.  It should also be noted that emergency works will not necessarily appear on the lists.  

If you require further information on any of the works please contact the Promoter as listed, useful contacts can be found in this table.

Major Works

Ashley Road - the next stage of the Three Towns Travel project has started in the Central Area of Ashley Road.    

Blandford Road Upton - Southern Gas Networks (SGN) are carrying out major works on Blandford Road in Upton, from Monday 19th January 2015 to Sunday 22nd February 2015. They have agreed with Dorset County Council that the best traffic management to be used for these works will be a one way southbound road closure which will affect roads in Poole.

Traffic will be able to travel northbound (out of Poole) but they will not be able to travel southbound (into Poole) from the double mini roundabouts at Upton to Yarrells Lane.  The official diversion route will be via Upton By-Pass, Holes Bay Road, West Street, Twin Sails Bridge and back to Blandford Road.
This will obviously impact on the road network in Poole and impact upon residents in Hamworthy, Creekmoor and Poole Town. Details of the SGN closure and signage can be found on the plan attached to the downloads section of this page opposite. 
SGN have set up a webpage to keep the public informed of progress:
 https://www.sgn.co.uk/Roadworks/Southern-projects/Poole,-Blandford-Road/
 In addition to the static warning signs that SGN have had on site advising of the planned works, advanced warning of the works is being displayed on the Borough’s Variable Message Signs (VMS) at the following sites: Upton Bypass, Dorset Way, Town Gate Bridge, Holes Bay Road and both signs on the Blandford Road.
Any enquiries about this project should be directed to SGN on 02392 624627 during office hours (8am to 4pm) or 0800 912 1700 outside these times.

 

Planned Road Closures

Occasionally a road may need to be closed, a list of all planned closures is below; please be aware emergency closures may not be shown:  

NORTH LODGE ROAD (between Lodge Close and Parkstone Avenue) - 5 FEBRUARY 2015 - between 9.30am and 4.30pm.  This closure is required for essential carriageway reinstatement.  If you have any queries please contact Mr N Ellis, Tel No 01202 262237.

LAKE ROAD (for approximately 10 metres either side of the railway bridge) - From 8pm on Friday 13 February until 6am on Saturday 14 February 2015.  This closure is required to ensure health and safety while the deck of the railway bridge is being replaced.  If you have any queries please contact Dyer and Butler, Tel No 02380 742222. 

 

 

 

 

 

 

 

 

 

 

Downloads